Space Shuttle NASA Mission Report: STS-3, March 1982 - Third Columbia Mission, Complete Technical Details of Orbiter Performance and Problems

This is the official final orbiter mission report issued by the NASA Johnson Space Center for the flight of STS-3, the third Space Shuttle mission, launched in March 1982 with Mattingly and Hartsfield. Forty-seven orbiter anomalies are discussed. Each orbiter system is reviewed in detail, with technical information on performance and anomalies.

Mission objectives included: Demonstrate safe re-launch and safe return of the orbiter and crew. Verify the combined performance of the entire shuttle vehicle - orbiter, solid rocket boosters and external tank.

Payloads included the 8,740 lbs. Office of Space Science (OSS-1) Pallet consisting of the Plant Lignification Experiment, the Plasma Diagnostic Package (PDP), the Vehicle Charging and Potential (VCAP) experiment, the Space Shuttle Induced Atmosphere experiment, the Thermal Canister experiment, the Solar Flare X-Ray Polarimeter, the Solar Ultraviolet and Spectral Irradiance Monitor (SUSIM), the Contamination Monitor Package and the Foil Microabrasion Package. Also in the payload bay was the 11,048 lbs. Development Flight Instrumentation (DFI) Pallet and the 448 lbs. Aerodynamic Coefficient Identification Package (ACIP). The crew compartment housed the Monodisperse Latex Reactor (MLR) experiment and the Heflex Bioengineering Test (HBT) experiment.

Mission Highlights: The launch was delayed one hour due to failure of a heater on the nitrogen gas ground support line. Testing continued of space shuttle systems for qualification for operational flights. Testing of remote manipulator system and measurements of thermal response of orbiter in various attitudes to sun conducted. Get Away Special test canister and Spacelab pallet-mounted experiments for NASA's Office of Space Science-1 (OSS-1) carried in payload bay. OSS-1 obtained data on near-Earth space environment, including contamination (gases, dust, etc.) introduced into space by orbiter itself. Other experiments: Monodisperse Latex Reactor (MLR), Electrophoresis Equipment Verification Test (EEVT), Heflex Bioengineering Test (HBT) and first Shuttle Student Involvement Program (SSIP) experiment. Problems encountered: space sickness, malfunctioning toilet, thermostat difficulty and unexplained static interfering with crew sleep. Auxiliary power unit registered overheating during ascent, but functioned properly during descent. Three communications links were lost.

1140558388
Space Shuttle NASA Mission Report: STS-3, March 1982 - Third Columbia Mission, Complete Technical Details of Orbiter Performance and Problems

This is the official final orbiter mission report issued by the NASA Johnson Space Center for the flight of STS-3, the third Space Shuttle mission, launched in March 1982 with Mattingly and Hartsfield. Forty-seven orbiter anomalies are discussed. Each orbiter system is reviewed in detail, with technical information on performance and anomalies.

Mission objectives included: Demonstrate safe re-launch and safe return of the orbiter and crew. Verify the combined performance of the entire shuttle vehicle - orbiter, solid rocket boosters and external tank.

Payloads included the 8,740 lbs. Office of Space Science (OSS-1) Pallet consisting of the Plant Lignification Experiment, the Plasma Diagnostic Package (PDP), the Vehicle Charging and Potential (VCAP) experiment, the Space Shuttle Induced Atmosphere experiment, the Thermal Canister experiment, the Solar Flare X-Ray Polarimeter, the Solar Ultraviolet and Spectral Irradiance Monitor (SUSIM), the Contamination Monitor Package and the Foil Microabrasion Package. Also in the payload bay was the 11,048 lbs. Development Flight Instrumentation (DFI) Pallet and the 448 lbs. Aerodynamic Coefficient Identification Package (ACIP). The crew compartment housed the Monodisperse Latex Reactor (MLR) experiment and the Heflex Bioengineering Test (HBT) experiment.

Mission Highlights: The launch was delayed one hour due to failure of a heater on the nitrogen gas ground support line. Testing continued of space shuttle systems for qualification for operational flights. Testing of remote manipulator system and measurements of thermal response of orbiter in various attitudes to sun conducted. Get Away Special test canister and Spacelab pallet-mounted experiments for NASA's Office of Space Science-1 (OSS-1) carried in payload bay. OSS-1 obtained data on near-Earth space environment, including contamination (gases, dust, etc.) introduced into space by orbiter itself. Other experiments: Monodisperse Latex Reactor (MLR), Electrophoresis Equipment Verification Test (EEVT), Heflex Bioengineering Test (HBT) and first Shuttle Student Involvement Program (SSIP) experiment. Problems encountered: space sickness, malfunctioning toilet, thermostat difficulty and unexplained static interfering with crew sleep. Auxiliary power unit registered overheating during ascent, but functioned properly during descent. Three communications links were lost.

9.99 In Stock
Space Shuttle NASA Mission Report: STS-3, March 1982 - Third Columbia Mission, Complete Technical Details of Orbiter Performance and Problems

Space Shuttle NASA Mission Report: STS-3, March 1982 - Third Columbia Mission, Complete Technical Details of Orbiter Performance and Problems

by Progressive Management (Compiler)
Space Shuttle NASA Mission Report: STS-3, March 1982 - Third Columbia Mission, Complete Technical Details of Orbiter Performance and Problems

Space Shuttle NASA Mission Report: STS-3, March 1982 - Third Columbia Mission, Complete Technical Details of Orbiter Performance and Problems

by Progressive Management (Compiler)

eBook

$9.99 

Available on Compatible NOOK devices, the free NOOK App and in My Digital Library.
WANT A NOOK?  Explore Now

Related collections and offers

LEND ME® See Details

Overview

This is the official final orbiter mission report issued by the NASA Johnson Space Center for the flight of STS-3, the third Space Shuttle mission, launched in March 1982 with Mattingly and Hartsfield. Forty-seven orbiter anomalies are discussed. Each orbiter system is reviewed in detail, with technical information on performance and anomalies.

Mission objectives included: Demonstrate safe re-launch and safe return of the orbiter and crew. Verify the combined performance of the entire shuttle vehicle - orbiter, solid rocket boosters and external tank.

Payloads included the 8,740 lbs. Office of Space Science (OSS-1) Pallet consisting of the Plant Lignification Experiment, the Plasma Diagnostic Package (PDP), the Vehicle Charging and Potential (VCAP) experiment, the Space Shuttle Induced Atmosphere experiment, the Thermal Canister experiment, the Solar Flare X-Ray Polarimeter, the Solar Ultraviolet and Spectral Irradiance Monitor (SUSIM), the Contamination Monitor Package and the Foil Microabrasion Package. Also in the payload bay was the 11,048 lbs. Development Flight Instrumentation (DFI) Pallet and the 448 lbs. Aerodynamic Coefficient Identification Package (ACIP). The crew compartment housed the Monodisperse Latex Reactor (MLR) experiment and the Heflex Bioengineering Test (HBT) experiment.

Mission Highlights: The launch was delayed one hour due to failure of a heater on the nitrogen gas ground support line. Testing continued of space shuttle systems for qualification for operational flights. Testing of remote manipulator system and measurements of thermal response of orbiter in various attitudes to sun conducted. Get Away Special test canister and Spacelab pallet-mounted experiments for NASA's Office of Space Science-1 (OSS-1) carried in payload bay. OSS-1 obtained data on near-Earth space environment, including contamination (gases, dust, etc.) introduced into space by orbiter itself. Other experiments: Monodisperse Latex Reactor (MLR), Electrophoresis Equipment Verification Test (EEVT), Heflex Bioengineering Test (HBT) and first Shuttle Student Involvement Program (SSIP) experiment. Problems encountered: space sickness, malfunctioning toilet, thermostat difficulty and unexplained static interfering with crew sleep. Auxiliary power unit registered overheating during ascent, but functioned properly during descent. Three communications links were lost.


Product Details

BN ID: 2940032944126
Publisher: Progressive Management
Publication date: 12/20/2011
Sold by: Smashwords
Format: eBook
File size: 216 KB

About the Author

Progressive Management:

For over a quarter of a century, our news, educational, technical, scientific, and medical publications have made unique and valuable references accessible to all people.

Our imprints include PM Medical Health News, Advanced Professional Education and News Service, Auto Racing Analysis, and World Spaceflight News.

Many of our publications synthesize official information with original material. They are designed to provide a convenient user-friendly reference work to uniformly present authoritative knowledge that can be rapidly read, reviewed or searched. Vast archives of important data that might otherwise remain inaccessible are available for instant review no matter where you are.

The e-book format makes a great reference work and educational tool. There is no other reference book that is as convenient, comprehensive, thoroughly researched, and portable - everything you need to know, from renowned experts you trust.

Our e-books put knowledge at your fingertips, and an expert in your pocket!

From the B&N Reads Blog

Customer Reviews