Construction Project Management: A Practical Guide for Building and Electrical Contractors

Construction Project Management: A Practical Guide for Building and Electrical Contractors

by Eddy Rojas
Construction Project Management: A Practical Guide for Building and Electrical Contractors

Construction Project Management: A Practical Guide for Building and Electrical Contractors

by Eddy Rojas

eBook

$29.99  $39.99 Save 25% Current price is $29.99, Original price is $39.99. You Save 25%.

Available on Compatible NOOK devices, the free NOOK App and in My Digital Library.
WANT A NOOK?  Explore Now

Related collections and offers

LEND ME® See Details

Overview

Construction Project Management offers some of the best project management studies commissioned by ELECTRI International: The Foundation for Electrical Construction that were selected, coordinated, and monitored by some of the most progressive contractors and performed by outstanding scholars from top U.S. universities. Topics include pre-construction planning, early warning signs of project distress, impact of change orders, project sequencing, ideal jobsite inventory levels, tool and material control systems, recommended safety practices, partnering, total quality management, quality assurance, performance evaluations, and contract risk management. All specialty and general contractors will find value in this practical book. The concepts presented will improve your understanding of the main issues affecting construction project management and will provide you with tools and strategies to enhance your company's productivity and profitability.WAV offers downloadable files consisting of:
  • Checklists for each one of the 10 categories that make up the model pre-construction planning process, including standard procedures for change orders, RFIs, submittals, transmittals, billing, progress updates, a sample requirements and expectations letter and a sample letter of intent.
  • A Spanish translation of Chapter 7: Recommended Safety Practices.
  • A methodology for assessing contractors' TQM program progress based on the Malcolm Baldrige National Quality Award Criteria.
  • Materials to assist contractors in preparing a quality assurance manual and implementing an effective quality assurance program.
  • A template for a partnering workshop that includes a sample partnering agenda, an introduction to the basic partnering concepts, sample mission statements, and a sample partnering charter.
  • Sample evaluation forms that contractors can customize to evaluate supervisors, journeymen, and apprentices.

Product Details

ISBN-13: 9781604276701
Publisher: Ross, J. Publishing, Incorporated
Publication date: 06/01/2009
Sold by: Barnes & Noble
Format: eBook
Pages: 432
File size: 6 MB

About the Author

Dr. Eddy M. Rojas is Professor of Construction Management at the University of Washington, where he is the Graduate Program Coordinator and the Executive Director of the Pacific Northwest Center for Construction Research and Education. He is an internationally recognized scholar in construction engineering and management. Dr. Rojas has published numerous papers in professional journals and conference proceedings and is also the developer and facilitator of the Virtual Community of Construction Scholars. His research interests are modeling, simulation, and visualization of construction engineering and management processes; engineering education; and construction economics.

Read an Excerpt

CHAPTER 1

PRE-CONSTRUCTION PLANNING

Dr. Awad S. Hanna,University of Wisconsin–Madison

Dr. Cindy L. Menches,University of Texas at Austin

INTRODUCTION

The importance of planning is unmistakable given the challenges faced by contractors in a competitive construction market. These challenges include reducing costs, improving labor productivity, minimizing changes, and maximizing resources to increase profitability. These challenges are intensified by increasingly tight timelines and ever more complex projects that test the management capabilities of even the best companies. A consensus exists in the construction industry that more formalized pre-construction planning is necessary to remain successful in an increasingly competitive industry. Accordingly, contractors are turning to pre-construction planning as one approach to improving their competitive edge.

The study presented in this chapter critically evaluates the relationship between pre-construction planning and project performance. As part of our research process, in-depth project-specific information was collected on the planning effort and project outcome for several successful and less-than-successful projects. This data collection effort culminated in a detailed analysis of the planning practices of these two groups to identify clear differences between successful and less-than-successful projects. Twenty-seven randomly selected companies from 11 statesparticipated in our research effort. Data were collected on 29 successful and 27 less-than-successful projects.

The planning activities that were performed on the successful projects were used to develop a model pre-construction planning process. This model process was fashioned after those projects that performed effective planning and achieved a successful outcome. As such, this model process incorporates the best planning practices of the companies that participated in our research effort. The planning process of successful and less-than-successful projects was compared to the model process, and we discovered that those planning processes that more closely matched the model resulted in more successful performance.

METHODOLOGY

The primary goal of our research effort was to investigate and quantify the effect of pre-construction planning on project performance. To support this goal, our research attempted to provide evidence to support two main hypotheses:

1. Projects that experience an appropriate planning effort also experience more successful outcomes.

2. There are significant pre-construction planning activities that distinguish a successful project from a less-than-successful project.

The research was conducted in three distinct phases. In Phase 1, the current state of pre-construction planning was investigated by developing and administering a questionnaire to nearly 2000 randomly selected members of the National Electrical Contractors Association (NECA). Contractors were asked to identify all of the planning activities they typically performed as part of their pre-construction planning process. These data were used in Phase 2 to construct an initial model pre-construction planning process. Finally, in Phase 3 a detailed sampling plan was developed to select a random sample of willing participants to respond to a questionnaire and participate in an interview. Data were collected from those contractors who responded to the initial survey in Phase 1 and who indicated they would be willing to provide additional information about their planning practices. Data were collected on two projects per contractor — one project that was well planned and performed successfully and one that was poorly planned and performed poorly. The project characteristics, planning activities, and performance of the successful and less-than-successful projects were compared to identify distinct differences. The relationship between characteristics, planning, and performance was modeled, and evidence was provided, to support the theory that projects that experience more effective planning also tend to achieve more successful outcomes.

The data collection effort culminated in a detailed analysis of the planning practices of well-planned and poorly-planned projects to identify clear differences between successful and less-than-successful performers. The data analysis resulted in: (1) the development of a technique to classify and quantify the inherent characteristics of a project, which might influence how a project is planned; (2) the refinement and validation of a model pre-construction planning process based on the best practices of the participating contractors; (3) the creation of a scorecard to compare the actual planning effort on projects to the model planning process; (4) the development of a technique for quantifying the effectiveness of an actual planning process; and (5) the investigation and quantification of the relationship between planning practices and project outcomes.

PRE-CONSTRUCTION PLANNING PROCESS

Pre-construction planning is the planning that is performed to prepare a construction project for execution. Pre-construction planning is also referred to as execution planning, pre-job planning, and more generically as pre-planning, which is a term applied in many fields to refer to that stage of planning that occurs before an event happens. In this chapter we use the term pre-construction planning.

In general, pre-construction planning begins during the preparation of the bid and ends shortly after the project has been executed. However, the vast majority of planning activities are performed after a contractor has been notified of a pending award. Hence, this chapter covers the planning activities that are performed after notification of pending award and are generally completed before the project has been executed.

The pre-construction planning process, which resulted from a detailed analysis of the planning processes used on successful projects, consists of 46 activities classified in 10 categories. Figure 1.1 presents the main categories of the model pre-construction planning process. Team member involvement in planning will typically be driven by the type of planning that needs to be completed. Figure 1.2 presents a matrix of the 10 planning categories and potential team members who may be involved. There are several strategies for successfully implementing the model pre-construction planning process as a standard procedure on all projects:

• Top managers must reinforce their commitment to a standardized planning process and must ensure planning is performed on every project.

• The model planning process must be tailored to each project based on its particular characteristics. For example, a small project might require only a few minutes on some of the activities, whereas a large project might require several hours or days on those same activities.

• A system for tracking the success on projects that are well planned and that followed the model planning process will serve to document its benefits.

• In addition to implementing a model planning process, consider implementing a "double-check" system in which the supervisor double-checks the planning performed by the project manager. This should ensure planning is performed consistently across the company.

• The early involvement of the field supervisor in the planning process has been shown to improve the chances for a successful project. Therefore, consider selecting and involving your field supervisor during the bidding stage or in the early part of the post-award stage.

• Ensure that excellent planning effort is applied to those activities that are identified as critical. These are the activities that have the greatest potential for impacting the outcome of the project.

• The planning kickoff meeting alerts all involved team members that the planning process is officially underway, and it allows the project manager to establish deadlines for completion of activities. Likewise, the construction execution kickoff meeting brings the team members back together to review the progress of the planning and ensures that all tasks have been, or will be, completed by the deadline. These two meetings should be held on all projects regardless of size. Lessons learned and a feedback loop should be an essential part of your standardized planning process. Project managers and field supervisors should share planning practices.

The results of our study revealed that the projects that received more effective pre-construction planning were also more likely to achieve successful outcomes. Success was defined by construction contractors as follows:

1. The project was profitable

2. The customer was satisfied

3. The project resulted in repeat business

4. The project resulted in good working relationships between the trade contractor, the general contractor, and the owner

5. The worksite was safe and there were no accidents

6. The project was completed on time

7. The workers took pride in the completed project

8. There was effective communication and cooperation between the trade contractor, the general contractor, and the owner

9. The quality of the work was excellent 10. The project achieved its budget goal

Consequently, projects that are planned using the pre-construction planning process outlined in this chapter can expect to increase their chances of achieving a successful outcome. However, it must be noted that effective planning alone does not guarantee the success of a project. Instead, effective planning coupled with good project management that takes into account a project's specific characteristics improves the likelihood of achieving successful project performance. Hence, effective planning should be performed during the pre-construction stage, and good project management should be applied during the execution stage to maximize the chances of completing a project successfully.

Overall, projects that implemented a planning process similar to the model planning process presented in this chapter tended to outperform those projects that were poorly planned or whose planning process was significantly different from the model process. Figure 1.3 shows the planning effectiveness score (where a higher score indicates more effective planning) against the chances of achieving a successful outcome for the projects analyzed in this study. Projects in the upper right quadrant are those that were well planned and also performed well, while projects in the lower left quadrant were not well planned and did not perform well.

PRE-CONSTRUCTION PLANNING ACTIVITIES

While planning begins during the bidding process, the bulk of the planning takes place during the pre-construction stage — after bidding but before execution. This section discusses those planning activities that should begin immediately upon notification of a pending award and essentially should be completed before executing the work. These activities, furthermore, set up a project to be successfully managed, which can significantly improve the chances that the project will make a profit and be completed on time.

By examining several well-planned projects, 46 activities that occurred during the pre-construction planning stage were identified and classified into 10 categories. Figure 1.4 provides a sample checklist of these 46 activities that make up the model pre-construction planning process. The activities should be checked off as they are performed to ensure that all activities are completed before the work is executed. However, there are instances when a project must begin before the pre-construction planning has been completed. The checklist can then be used to ensure that all of the planning activities are eventually completed and are not overlooked during the busy, and often intense, mobilization and execution stage.

Pre-construction planning begins immediately upon notification of a pending award. The planning may continue for several days, several weeks, or several months depending on the magnitude of the project. Planning should continue until all planning activities have been completed, even if the project must be executed prior to completing the planning process. Furthermore, the planning process should provide the framework for managing the project once the work has been executed. There are three primary goals of the pre-construction planning process:

1. To completely plan the project in a standardized and efficient manner to ensure that the tools, materials, equipment, and labor will be available to complete the project on time and within budget

2. To set up the systems that will be needed to efficiently manage the project, such as material purchasing, delivery, and storage; scheduling and tracking; change management; submittal tracking; and numerous other processes that are necessary to manage a successful project

3. To set the job up for successful execution and jobsite management

The following sections describe the 10 categories of the model pre-construction planning process shown in Figure 1.1 and the activities within each category.

Team Selection and Turnover Team selection and turnover involves selecting the project manager and field supervisor who will be responsible for managing the job during construction-execution. After the management team has been selected, a meeting should be held to formally turn over the project from the estimating stage to the project management stage. Furthermore, a planning kickoff meeting should be held to assign planning responsibilities to internal team members, including the purchasing agent, safety director, and operations director. The team selection and turnover process consists of four main activities.

Activity 1: Finalize Selection of Project Manager, Field Supervisor, and Other Key Team Members

• Assemble a list of project managers and review their current workload and special skills.

• Determine whether an ideal match can be made between the project manager and the job, and then select the project manager.

• Assemble a list of field supervisors and review their current workload and special skills.

• Determine whether an ideal match can be made between the field supervisor and the job, and then select the field supervisor.

• Work with the project manager, field supervisor, and/or the director of operations to select key foremen when appropriate.

Activity 2: Hold Turnover Meeting between Estimator and Project Manager

• Arrange a meeting time and location, and ensure that enough time has been allocated to transfer knowledge between the estimator and project manager. A formal turnover meeting is strongly recommended. The meeting time can vary widely from one hour to more than a day, depending on the size and complexity of the project.

• Follow and complete a checklist that describes the information that should be transferred. A sample turnover meeting agenda is shown in Figure 1.5.

Activity 3: Hold Separate Turnover Meetings between Project Manager and Field Supervisor

• Arrange a meeting time and location that will ensure enough time can be allocated to transfer knowledge between the project manager and field supervisor. A formal turnover meeting is strongly recommended. It is also recommended that the meeting be held at the office rather than on an existing jobsite so that the field supervisor can focus on the upcoming project without being interrupted. The meeting time can vary widely from one hour to more than a day depending on the size and complexity of the project and how many tasks must be completed during the turnover meeting.

• Follow and complete a checklist that describes the information that must be transferred. A sample turnover meeting agenda is shown in Figure 1.5.

Activity 4: Hold Pre-Job (Planning) Kickoff Meeting with Internal Team Members to Assign Responsibilities

• Arrange a meeting time and location, and ensure that enough time has been allocated to assign planning responsibilities.

• Invite internal team members who will be involved during the construction execution process, including project manager, field supervisor, accounting, purchasing, and the director of field operations.

• Follow and complete a checklist that describes the planning activities that must be completed and who is responsible for completing them. Figure 1.6 shows a sample planning kickoff meeting agenda.

Scope and Contract Review

A scope review involves reviewing all contract documents that will be used to execute the work and produce a high-quality end product. It involves becoming familiar with the detailed project requirements, including the systems that will be installed, equipment that must be powered, the materials that are specified, and the labor that will be required to complete the job successfully. A contract review involves reading the entire contract agreement, including general and special conditions, to identify any unusual or special provisions that must be accomplished as part of the scope of work. The scope and contract review process consists of eight activities.

(Continues…)


Excerpted from "Construction Project Management"
by .
Copyright © 2009 ELECTRI International: The Foundation for Electrical Construction Inc..
Excerpted by permission of J. Ross Publishing, Inc..
All rights reserved. No part of this excerpt may be reproduced or reprinted without permission in writing from the publisher.
Excerpts are provided by Dial-A-Book Inc. solely for the personal use of visitors to this web site.

Table of Contents

Preface ix

About the Editor xi

Web Added Value™ xiii

Chapter 1 Pre-Construction Planning 1

Introduction 1

Methodology 2

Pre-Construction Planning Process 3

Pre-Construction Planning Activities 8

Planning Assessment Process 60

Conclusions 65

Chapter 2 Early Warning Signs of Project Distress 67

Introduction 67

Project Distress Diary 68

Case Study 1 70

Case Study 2 81

Conclusions 87

Chapter 3 Cumulative Impact of Change Orders 91

Introduction 91

Fundamental Concepts 92

Is Cumulative Impact Real? 94

Determining Impact 96

Quantifying Impact 100

Recommendations 103

Conclusions 105

Chapter 4 Sequencing Guidelines 107

Introduction 107

Background 108

Case Studies 110

Sequencing Guidelines 119

Rules to Support Sequencing Guidelines 120

Conclusions 126

Chapter 5 Ideal Jobsite Inventory Levels 129

Introduction 129

Inventory Principles 130

Developing the Loss Function 136

Optimal Inventory Levels in Construction 143

Optimal Material Management Models for Contractors 146

Six Steps of the Process of Procurement 147

Conclusions 155

Chapter 6 Tool and Material Control Systems 157

Introduction 157

Tool Control Systems 158

Material Control Systems 170

Conclusions 179

Chapter 7 Recommended Safety Practices 181

Introduction 181

Safety and the Bottom Line 182

Causation Theories: Why Do Accidents Happen? 183

Problem with Academic Accident Theory 185

Magnitude of the Safety Issue in the Construction Industry 187

Methodology 190

Anecdotal Experiences: Recommended Practices 191

Safety Program Analysis 200

Conclusions 206

Chapter 8 Total Quality Management 209

Introduction 209

Fundamentals ofTotal Quality Management 210

What Is Quality? 215

Committing to Quality? 217

Planning for Quality 220

Organizing for Quality 229

Managing for Quality 235

Identifying Improvements Opportunities 243

Implementing Total Quality Management in the Field 253

Measuring Results 266

Conclusions 272

Chapter 9 Quality Assurance 275

Introduction 275

Quality Assurance Fundamantals 276

Quality Assurance Program Model 280

Steps in Developing a Quality Assurance Program 291

Installation, Inspection, and Testing Procedures 295

Forms, Tags, Checklists, and Records 298

Evaluating Your Quality Assurance Program 298

Conclusions 301

Chapter 10 Partnering 303

Introduction 303

Partnering Fundamentals 304

Benefits of Partnering 308

Partnering Applications 308

Recommended Steps for Implementation 314

Conclusions 317

Chapter 11 Performance Evaluations 319

Introduction 319

Methodology 320

Purpose of Performance Evaluations 321

Survey of Supervisors' Duties and Attributes 323

Survey of Craftsmen's Duties and Attributes 330

Evaluation Process Details 338

Conducting Evaluations 341

Conclusions 345

Chapter 12 Contract Risk Management 347

Introduction 347

Preparing for Contract Risk Management 348

Rights and Responsibilities Clauses 351

Entitlement Clauses 364

Procedural Clauses 376

Conclusions 385

Bibliography 387

Index 391