5
1
Multimedia Set(BK & CD-Rom)
$19.95
-
PICK UP IN STORECheck Availability at Nearby Stores
Available within 2 business hours
Related collections and offers
19.95
In Stock
Overview
Provides details of the last Gemini flight, flown by veteran Commander James Lovell and brilliant rookie Edwin “Buzz” Aldrin.
Product Details
ISBN-13: | 9781894959049 |
---|---|
Publisher: | Collector's Guide Publishing, Inc. |
Publication date: | 01/01/2004 |
Series: | Apogee Books Space Series , #40 |
Edition description: | BK & CD-Rom |
Pages: | 265 |
Product dimensions: | 7.00(w) x 10.00(h) x 0.61(d) |
Table of Contents
Gemini 12 News Releases--November 3, 1966 | ||
MSC 66-46--June 17, 1966 | 10 | |
MSC 66-71A--September 27, 1966 | 11 | |
MSC 66-78--October 10, 1966 | 12 | |
Ames 66-15--November 7, 1966 | 14 | |
Ames 66-16--November 5, 1966 | 17 | |
Gemini 12 Press Kit--November 3, 1966 | ||
General Release | 21 | |
Preflight Activities and Integrated Countdown | ||
Launch Vehicle Countdown | 23 | |
Reentry | 23 | |
Mission Description | ||
Launch | 24 | |
Rendezvous | 24 | |
Agena PPS Maneuver | 25 | |
First Stand-up EVA | 25 | |
Umbilical Extravehicular Activity | 25 | |
Station-Keeping Exercise | 26 | |
Solar Eclipse Phasing | 26 | |
Second Stand-up EVA | 26 | |
Retrofire and Reentry | 26 | |
Experiments | 27 | |
Cameras | 33 | |
Crew Provisions and Training | ||
Crew Training Background | 33 | |
Gemini 12 Suits | 34 | |
Extravehicular Life Support System (ELSS) | 34 | |
Medical Checks | 35 | |
Body Waste Disposal | 35 | |
Water Measuring System | 35 | |
Food and Flight Menu | 35 | |
Manned Space Flight Tracking Network | ||
Mission Requirements | 36 | |
Real Time Computer Complex (RTCC) | 36 | |
Tracking | 36 | |
Ground Communications | 39 | |
Network Responsibility | 39 | |
Network Configuration | 40 | |
Abort and Recovery | ||
Crew Safety | 40 | |
Planned and Contingency Landing Areas | 41 | |
Spacecraft and Launch Vehicles | ||
Gemini Spacecraft | 41 | |
Gemini Launch Vehicle | 43 | |
Agena Target Vehicle | 44 | |
Atlas Launch Vehicle | 45 | |
Crew Biographies | 46 | |
Previous Gemini Flights | 48 | |
Project Officials | 51 | |
Spacecraft Contractors | 52 | |
Approximate Times of Major Events | 53 | |
Gemini 12 Summary Operations Plan--October 31, 1966 | 59 | |
Gemini Program; Record of Accomplishments--January 17, 1967 | 66 | |
Gemini 12 Technical Debriefing--November 22, 1966 | ||
1.0 | Countdown | |
1.1 | Crew Ingress | 74 |
1.2 | Communications | 74 |
1.3 | ECS | 74 |
1.4 | Prelaunch Checkout | 75 |
1.5 | Launch Azimuth Update | 75 |
2.0 | Powered Flight | |
2.1 | Lift-off | 75 |
2.2 | Roll Program | 76 |
2.3 | Pitch Program | 76 |
2.4 | ECS | 76 |
2.5 | DCS Updates | 76 |
2.6 | Engine I Operation | 76 |
2.7 | Engine 2 Status | 76 |
2.8 | BECO | 76 |
2.9 | Staging | 76 |
2.10 | Engine 2 Ignition | 77 |
2.11 | RCS Initiate | 77 |
2.12 | Steering | 77 |
2.13 | Go/No Go | 77 |
2.14 | Systems Status | 77 |
2.15 | SECO | 77 |
2.16 | Communications | 77 |
3.0 | Insertion | |
3.1 | Post SECO | 77 |
3.2 | SECO Plus 20 Seconds | 78 |
3.3 | Insertion Checklist | 79 |
4.0 | Orbital Operations | 80 |
5.0 | Retrofire | |
5.1 | T[subscript r]-256 Checklists | 162 |
5.2 | T[subscript r]-0 | 164 |
6.0 | Reentry | |
6.1 | Reentry Update | 164 |
6.2 | Attitude Control Modes | 165 |
6.3 | Reentry Control Technique | 165 |
6.4 | Guidance | 166 |
6.5 | Drogue Chute Deployment | 166 |
6.6 | Main Chute Deployment | 168 |
7.0 | Landing and Recovery | |
7.1 | Impact | 168 |
7.2 | Communications | 169 |
7.3 | Postlanding Spacecraft Status | 169 |
7.4 | Comfort | 170 |
7.5 | Recovery Team | 170 |
7.6 | Crew Egress | 170 |
7.7 | Survival Gear | 170 |
7.8 | Crew Pickup | 170 |
8.0 | Systems Operations | |
8.1 | Platform | 170 |
8.2 | OAMS | 171 |
8.3 | RCS | 174 |
8.4 | ECS | 175 |
8.5 | Communications | 184 |
8.6 | Electrical | 185 |
8.7 | On-board Computer | 186 |
8.8 | Radar | 187 |
8.9 | Crew Station | 188 |
8.10 | Spacecraft Exterior | 192 |
9.0 | Visual Sightings | |
9.1 | Countdown | 192 |
9.2 | Powered Flight | 192 |
9.3 | Orbital Flight | 193 |
9.4 | Retrofire and Reentry | 196 |
10.0 | Experiments | |
10.1 | Frog Egg Growth | 197 |
10.2 | Synoptic Terrain Photography | 197 |
10.3 | Airglow Horizon Photography S-11 experiment | 198 |
10.4 | Micrometeorite Collection S-12 | 198 |
10.5 | UV Astronomical Camera S-13 | 198 |
10.6 | Libration Regions Photography S-29 | 199 |
10.7 | Sodium Vapor Clouds S-51 | 199 |
10.8 | Tri-Axis Magnetometer (M-405) | 200 |
10.9 | Beta Spectrometer (M-408) | 200 |
10.10 | Bremsstrahlung Spectrometer (M-409) | 200 |
10.11 | Manual Navigation Sightings (T-2) | 200 |
11.0 | Premission Planning | |
11.1 | Mission Planning | 202 |
11.2 | Experiments | 203 |
12.0 | Mission Control | 204 |
13.0 | Training | |
13.1 | Gemini Mission Simulator | 206 |
13.2 | Launch Abort Training | 206 |
13.3 | MAC Engineering simulators | 207 |
13.4 | Translation and docking trainer | 207 |
13.5 | Planetarium | 207 |
13.6 | Systems Briefing | 208 |
13.8 | Spacecraft Systems Status | 209 |
13.9 | Egress Training | 209 |
13.10 | Launch Simulations | 209 |
13.11 | Reentry Simulation | 210 |
13.12 | Simulated Network Simulation | 210 |
13.13 | Zero "G" Flights | 210 |
13.14 | Underwater Zero "G" | 210 |
13.15 | MSC Altitude Chamber | 210 |
13.16 | Gemini Crew Station Mockup | 211 |
13.17 | Gemini Adapter Mockup | 212 |
13.18 | Agena Mockup | 212 |
13.19 | Sextant Training Equipment | 212 |
13.20 | Camera Training Equipment | 212 |
Rendezvous Concept for Circumlunar Flyby in 1967 | ||
Index | 215 |
From the B&N Reads Blog
Page 1 of